Starting off the build I first worked on the rotors. I opened up the holes on the parts of the hubs. With the hubs assembled I filled in the mold marks with putty and then added the 30 gauge wire for the hydraulic lines and some photo etch parts for the mounts. The hub was painted flat black as well as the underside of the blades. The topside was then painted olive drab. The reference photos showed red seals for the joint where the rotor blades pitch. I used red paint to represent these. I finished off the rotors with decals from the kit.
I set aside the rotors and am now starting on the interior walls of the crew/cargo area. There are quite a few mold marks on these that needed to be filled before I can start detailing. I also compared the walls with numerous reference photos. There are quite a few things that need to be relocated and added. As soon as the putty is cured I will begin the correction and adding details to the port wall first.
You can see the start of this project in the build log at: https://davidsscalemodels.com/build-log ... elicopter/




































































































































